All guides

How to brief a commercial coffee machine supplier for a new office

Opening an office in Hong Kong? Copy this rental and purchase enquiry to get a machine, installation date and first-user training into the same quote.

A technician and an office manager check a floor plan on an empty pantry counter beside a tape measure and keys.

Decide what needs to work on opening morning

Start with the first people through the door. Suppose 24 colleagues will move into a new Quarry Bay office on Monday 14 December 2026. Twelve usually get coffee before the 9 am meeting, and four of them drink lattes. The supplier needs to know about those twelve orders and the milk, even if the team eventually grows to 50.

Choose one colleague to accept the machine on Friday. Before the installer leaves, ask your colleague to make the team’s usual coffees without help and run the end-of-day clean. This gives you a handover time to book and a clear answer when your manager asks whether the pantry will be ready on Monday.

Copy this enquiry into an email or WhatsApp

Replace the dates, drinks and access arrangements with yours. Attach a photo of the counter.

Hello, our 24-person office in Quarry Bay opens on Monday 14 December. We expect eight black coffees and four lattes between 8:45 and 9 am. The counter has a socket and a sink nearby. We need a refillable water tank.

On Friday 11 December, the loading bay and goods lift to the 22nd floor are available from 9 to 10 am. Can you deliver in that slot, install and test the machine, and teach our receptionist to make drinks and clean it before noon?

Which model do you recommend? Please quote rental and purchase for the same setup. Include everything we need to serve the first latte, including milk refrigeration if required. Show any minimum bean order or service commitment. Price optional deliveries and service visits separately, and confirm when you can hand over the working machine.

Compare when each offer gets you brewing

Suppose the first supplier can deliver on Friday but books the installer for Monday afternoon. The second can deliver on Thursday and train your receptionist on Friday. Ask building management whether a Thursday lift slot is available before recommending the second offer. If Thursday is full, ask the first supplier for a Friday installation slot before accepting either quote.

Give your manager one line per offer with the earliest confirmed time staff can make coffee, the cost of getting there, and any ongoing commitment. Keep extras such as a weekly bean delivery on their own line so your manager can approve the machine without ordering an unwanted service. Compare the rental and purchase costs over the same term